Barhale to Lead £14.6M Alconbury Weald Pipeline Project
2 Articles
2 Articles
Barhale Lands £14.6M Alconbury Weald Pipeline Project
Civil engineering, infrastructure and tunnelling specialist Barhale has been appointed by Anglian Water to construct a £14.6M twin pumped rising main featuring complex horizontal directional drilling (HDD) crossings beneath the East Coast Main Line and the River Great Ouse. The new 7,460m pipeline will provide the wastewater network capacity to meet future development at Alconbury Weald in Cambridgeshire. Centred on the former RAF Alconbury base…
Barhale to Lead £14.6M Alconbury Weald Pipeline Project
Civil engineering, infrastructure and tunnelling specialist Barhale has been appointed by Anglian Water to construct a £14.6M twin pumped rising main featuring complex horizontal directional drilling (HDD) crossings beneath the East Coast Main Line and the River Great Ouse. The new 7,460m pipeline will provide the wastewater network capacity to meet future development at Alconbury Weald in Cambridgeshire. Centred on the former RAF Alconbury base…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium




