Single-lane closures with a pilot car from 6:30 a.m. to 5:30 p.m. A $1.74 million roadway rehabilitation project on U.S. 380 east of Roswell, is scheduled to begin on Monday, August 17. The rehabilitation project extends from milepost 180 to milepost 184.9 and includes a 3-inch mill and fill of the roadway surface and new striping. These improvements will provide a smoother driving surface, extend pavement life, and enhance safety for motorists…