Any operators wishing to participate in the trial will be required to obtain a permit. Image: Jackson Photography/stock.adobe.com/
The Department of Transport and Main Roads (TMR) has begun a 12-month trial period permitting access for approved Type 2 road train vehicle movements along a key livestock route, under permit.
The trial will enable Type 2 road trains (between 36.5-metres to 53.5-metres in length) to travel between Emerald Downs and t…