Skip to main content
See every side of every news story
Published loading...Updated

Wind Power Measurements in Sensitive Tyrolean Region

Summary by Kronen Zeitung
Androschin Energie GmbH from Innsbruck and Ecowind (NÖ) commissioned a measuring system on a high-alm in Silz (Tiroler Bezirk Imst): this was a first step for a possible project. A SODAR wind meter was recently installed and put into operation at the Hochalm Feldringer Boden in the municipality of Silz, the operators reported yesterday in a message. "It is explicitly a purely measuring and testing phase. Whether and in what form the construction…

1 Articles

Right

Androschin Energie GmbH from Innsbruck and Ecowind (NÖ) commissioned a measuring system on a high-alm in Silz (Tiroler Bezirk Imst): this was a first step for a possible project. A SODAR wind meter was recently installed and put into operation at the Hochalm Feldringer Boden in the municipality of Silz, the operators reported yesterday in a message. "It is explicitly a purely measuring and testing phase. Whether and in what form the construction…

·Vienna, Austria
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Kronen Zeitung broke the news in Vienna, Austria on Wednesday, February 4, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal