Published • loading... • Updated
West Gate Tunnel opening date revealed
The $10.2 billion West Gate Tunnel will divert 9,000 trucks daily from local streets, reducing travel times by up to 20 minutes for Melbourne motorists, officials said.
- On Sunday December 14, the West Gate Tunnel project opens in Melbourne, providing twin tunnels as an alternative to the West Gate Bridge linking Yarraville to CityLink.
- After construction halted in 2019 over toxic soil, work resumed only after Victorians chipped in $2 billion to help cover a $4 billion blowout.
- The mega-highway comprises 6.8 kilometres of tunnels and 9.2 kilometres of elevated roads, widening the West Gate Freeway from eight to 12 lanes and adding a 2.5km cycling path.
- Motorists may save up to 20 minutes, and 9000 trucks will be removed daily from local streets when the tunnel opens on Sunday.
- Tolling arrangements mean the road will be tolled until at least 2045, with heavy vehicles charged up to $178 daily, while travel is free on weekends in January.
Insights by Ground AI
11 Articles
11 Articles
Melbourne's West Gate Tunnel is finally opening. Here's what it means for motorists
Melbourne motorists will finally reap the rewards of the long-awaited West Gate Tunnel project, after a decade plagued by scandal, project delays and cost blowouts.The $10.2 billion project promises to get more than 9000 trucks off local roads and save drivers up to 20 minutes on travel time when it opens on Sunday.Built as a partnership between the state government and toll company Transurban, the twin tunnels will give drivers an alternative …
·Australia
Read Full ArticleCoverage Details
Total News Sources11
Leaning Left3Leaning Right2Center1Last UpdatedBias Distribution50% Left
Bias Distribution
- 50% of the sources lean Left
50% Left
L 50%
C 17%
R 33%
Factuality
To view factuality data please Upgrade to Premium







