Skip to main content
See every side of every news story
Published • loading... • Updated

Australia’s Most Powerful Battery Storage System Officially Completed

The 850 MW system can power up to 340,000 homes and is designed to stabilize the grid as coal plants retire.

  • The Waratah Super Battery is now fully operational, adding 850MW of dispatchable power and 1,680MWh of storage capacity to the NSW electricity grid.
  • A "catastrophic failure" of High Voltage Transformer 3 in October 2025 had restricted operations to 350MW until Akaysha Energy replaced the component and restored full capacity.
  • Acting as a shock absorber for the network, the system can power up to 340,000 NSW households at peak demand while monitoring 36 transmission lines in real time.
  • Akaysha CEO Nick Carter called the final commercial operations a "landmark moment," with the project attracting more than AU$1 billion in private investment and involving around 1,000 people.
  • EnergyCo CEO Hannah McCaughey called the battery a "world-leading piece of energy infrastructure" that ensures reliable power as aging coal-fired power stations retire across NSW.
Insights by Ground AI

14 Articles

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Echonetdaily broke the news on Monday, September 28, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal