Vučić Opened a Section of the Danube Corridor: The Goal of 3,000 Kilometers of Highways by 2050
9 Articles
9 Articles
The President of Serbia, Aleksandar Vučić, said today, at the ceremony marking the opening of the new 28 kilometers of the Danube Corridor, that Serbia knows no obstacles when building its future.
The new sections of the Danube Corridor, with a total length of 28 kilometers, will be completely open to traffic from Monday, August 31, at 12:00 p.m., Serbian President Aleksandar Vučić announced. With the opening of these routes, the high-speed road between the highway Belgrade-Niš, Požarevac, Veliko Gradište and Golupac is nearing completion, and there are still six kilometers left before full functionality. At the ceremony [...] The article…
The new section of the Danube Corridor, 28 kilometers long, from Požarevac to Veliko Gradište, will be opened for traffic tomorrow at 12 noon, while the completion of
The new 28 kilometers of the Danube Corridor were opened today.
The opening of the Danube Corridor enables better connectivity between Belgrade and eastern Serbia, with modern infrastructure standards.
Coverage Details
Bias Distribution
- 100% of the sources lean Left
Factuality
To view factuality data please Upgrade to Premium





