Skip to main content
See who owns your news
Published • loading... • Updated

Key Moment on an Important Section of the Sibiu-Pitești Highways. Work at the Longest Tunnel in Romania

Summary by Wall-Street
The authorities of the Directorate of Roads and Bridges (DRDP) Craiova transmits that the platform intended to mount and launch the TBM (tunnel boring machine / tunnel drilling machine) that will drill the Poiana Tunnel, on Section 3 Cornetu–Tigveni of the Sibiu–Pitești Highway, is almost completed.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

8 Articles

The works on Section 3 Cornetu–Tigveni of the Sibiu–Pitești Motorway (A1) have reached a physical stage of 18.89%. The Tronson has 37.4 kilometers and is entirely in the area of administration of the DRDP Craiova. On the yard there are currently about 1,200 workers, along with 522 machines and equipment. The teams work on the terraces, reinforcements and structures planned on the route. One [...] Article Coming the mole on Lot 3, at the Poiana t…

Read Full Article

On the mountain section of the Sibiu – Pitești Highway, designed to cross the Carpathians, Cristian Pistol announces that the Poiana Tunnel will soon receive its drilling head. The Poiana Tunnel is the first motorway tunnel in Romania executed with TBM. The Director General of the CNAIR said that the piece, with a diameter of about 6,5 meters and a [...]

Fædrelandsvennen - Get the latest news from Kristiansand and Agder here. We'll keep you updated on what's happening.

·Kristiansand, Norway
Read Full Article

DRDP Craiova has transmitted that preparations are being made for the assembly and launch of the TBM that will drill the Poiana Tunnel, on Section 3 Cornetu–Tigveni of the Sibiu–Pitești Highway. It is the first tunnel that will be realized with this technology. [...] Article FOTO ☆ A "brick starter for the Poiana Tunnel, the longest on the A1 Bucharest – Sibiu. It will be the first underground highway track drilled with a TDM appears first in B3…

The platform for mounting and launching the TBM that will drill the Poiana Tunnel, on section 3 Cornetu – Tigveni of the Sibiu – Pitești motorway, is almost finished, announces Monday the Regional Directorate of Roads and Bridges (DRDP) Craiova. It will also soon arrive in the yard the first component of "the mole, respectively drilling head.

The authorities of the Directorate of Roads and Bridges (DRDP) Craiova transmits that the platform intended to mount and launch the TBM (tunnel boring machine / tunnel drilling machine) that will drill the Poiana Tunnel, on Section 3 Cornetu–Tigveni of the Sibiu–Pitești Highway, is almost completed.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Mediafax broke the news on Monday, October 5, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal