Skip to main content
See every side of every news story
Published loading...Updated

Tuas Power to Build 670MW Hydrogen-Ready Turbine by 2031

Summary by Asia One
Tuas Power has won the right to build, own and operate a new turbine, which will raise Singapore's electricity generation capacity by December 2031.The upcoming hydrogen-ready combined cycle gas turbine (CCGT) will have a 670MW capacity and can power about 1.2 million 4-room HDB flats for a year.This will add to the more than 20 CCGTs in the power system...

Bias Distribution

  • 50% of the sources are Center, 50% of the sources lean Right
50% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

The Straits Times broke the news in Singapore, Singapore on Thursday, August 20, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal