Published • loading... • Updated
Too Much Waste, the Generator-Pays Approach Applied - Radio Gaspésie
Summary by radiogaspesie.ca
1 Articles
1 Articles
In fact, the budget is rising from just over $11 million to $12 million due to the construction of two new landfill cells and the new transportation collection contract with Solution 360. The Director, Nathalie Drapeau, states that the construction of two cells at the Gaspé LET will cost $3.8 million, 68% more than those built five years ago, which are at the end of their lives: https://www.radiogaspesie.ca/wp-content/uploads/N325A-7.
·Gaspé, Canada
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium