Skip to main content
See every side of every news story
Published loading...Updated

Three Months Later, Flagler Beach Commissioners Finally Agree on Design of $2.6 Million 'Beachwalk' by Pier

Summary by FlaglerLive
After twice rejecting the design for the rebuilding of the Flagler Beach boardwalk and the structures under the A-frame at the pier, the Flagler Beach City Commission approved the preliminary drawings for both in what will be a $2.6 million reconstruction, with new concrete pilings beneath and a large deck and breezeway above. If the cost remains close to $2.6 million, it will be a surprise. The post Three Months Later, Flagler Beach Commissione…

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

FlaglerLive broke the news in on Monday, September 29, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal