Skip to main content
See every side of every news story
Published • loading... • Updated

Catalonia Will Have to Use the State Energy Network or Gas if It Wants to Shut Down Nuclear Power

Summary by La Vanguardia
The closure of the Ascó I nuclear reactor by 2030 will require a 230% increase in renewables, according to a report by the NGO Renovemnos

3 Articles

Lean Left

The closure of the Ascó I nuclear reactor by 2030 will require a 230% increase in renewables, according to a report by the NGO Renovemnos

·Barcelona, Spain
Read Full Article

The NGO Renovem-nos, focused on the energy transition and climate change, has presented a technical report that warns that Catalonia is not ready to close Ascó I in 2030 if the current pace of renewables deployment is maintained. If it is not accelerated by 230%, the report says that the country will have to increase electricity imports and could [...] The NGO Renovem-nos warns that Catalonia is not ready to close Ascó I with the current pace of…

Read Full Article

A report concludes that the transition must be accelerated by 300% or depend on the State or gas to replace nuclear power

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

diarimes.com broke the news on Wednesday, September 30, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal