Skip to main content
See every side of every news story
Published • loading... • Updated

The Transfer Tajo-Safe Will Be Closed Until 2027 Due to Two Faults in the Channel

Summary by El Confidencial
The basin organism has decided to keep the passage of water cut to avoid the "collapse" of the canal after verifying the destruction and sinking of several concrete cloths and the appearance of oquities in the ground

7 Articles

Right

The Tajo-Safe transfer, the great hydraulic connection between the head of the Tagus and the peninsular southeast, will remain closed until 2027.Two ruptures in the canal have left the 292 kilometers of this key infrastructure dry for the Levante.This is reported by the Hydrographic Confederation of the Tagus (CHT), which calculates an initial period of between 4 ... Continue reading "No water until 2027: the 292 kilometers of the Tajo-Safe tran…

·Madrid, Spain
Read Full Article
Center

The basin organism has decided to keep the passage of water cut to avoid the "collapse" of the canal after verifying the destruction and sinking of several concrete cloths and the appearance of oquities in the ground

·Pozuelo de Alarcón, Spain
Read Full Article
Lean Left

From the Hydrographic Confederation of the Tagus they point out that the works of repair of these incidents located on 14 September will require an initial period of between four and five months and an investment of 1,2 million euros

·Madrid, Spain
Read Full Article
Center

The transfer Tajo-Safe will remain inoperative and without water supply to the Levante until 2027 due to...

·Spain
Read Full Article

The Tagus Hydrographic Confederation (CHT) has begun work to repair the fractures detected in two points of the Tagus-Safe aqueduct (ATS), after anomalous leaks were located in the infrastructure on 14 September. The agency under the Ministry for the Ecological Transition has taken two weeks to report that not only did a section of the transfer take place in Liétor (Albacete), as it collected INFORMATION, but also another large one was detected …

The Tagus Hydrographic Confederation repairs two ruptures of the Tagus-Safe aqueduct in Almonacid de Zorita (Guadalajara) and Liétor (Albacete). It detected them on September 14, after unusual leaks appeared in the canal. The organism will not resume the transfer until the works are completed, to avoid the collapse of the channel. The estimated time frame is initially four or five months, with an investment of about 1.2 million euros.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources are Center
50% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

À Punt broke the news on Monday, September 28, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal