Published • loading... • Updated
The Residents Must Take Their Pains in Patience: the Construction Site of the Bridge of Iguerande, Closed in Emergency in 2025, Is at the Stop
Summary by franceinfo.fr
1 Articles
1 Articles
The Department of Saône-et-Loire announced this February 3rd that the work of the bridge of Iguerande is made impossible, because of the high level of the Loire. The bridge may not reopen until the end of 2026.
Coverage Details
Total News Sources1
Leaning Left1Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium
