It Will Be Connected by a 705-Meter Tunnel and Bridges: Travel Time Will Be Shortened by 40 Minutes - Sözcü Newspaper
9 Articles
9 Articles
Minister of Transport and Infrastructure Abdulkadir Uraloğlu announced that the 16.1-kilometer section of the Konya Ring Road between Aksaray and Adana will be completed this year, and that the project will save billions of lira annually by shortening travel times.
Minister of Transport and Infrastructure Abdulkadir Uraloğlu announced that they aim to complete the works on the 16.1-kilometer section between the Aksaray and Adana axes, within the scope of the 2nd phase of the Konya Ring Road, this year. Minister Uraloğlu stated that the services provided by the commissioning of this section will...
Work continues on the Konya Ring Road. The 16.1-kilometer section between the Aksaray and Adana axes is targeted for completion by the end of this year.
Minister of Transport and Infrastructure Abdulkadir Uraloğlu announced that the 16.1-kilometer section of the Konya Ring Road between the Aksaray and Adana axes is targeted for completion this year. With the completion of the second phase of the project, travel time will be shortened by 40 minutes, resulting in annual savings of 3 billion 78 million Turkish Lira. 🚆
Work continues at a rapid pace on the Konya Ring Road. The 16.1-kilometer section between Aksaray and Adana is targeted for completion this year, while the other phase will include the construction of a 705-meter double-tube tunnel, viaducts, and bridges. The completion of the project is expected to result in billions of liras in savings.
Minister of Transport and Infrastructure Abdulkadir Uraloğlu announced that they aim to complete and open to traffic the 16.1-kilometer Aksaray-Adana section, which is part of the second phase of the Konya Ring Road, by the end of 2026.
Coverage Details
Bias Distribution
- 50% of the sources lean Left, 50% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium






