Published • loading... • Updated
Structural Work on the Bridge over the Monday River Is Intensified
Summary by .::Agencia IP::.
1 Articles
1 Articles
Asunción, IP Agency.- The construction of the second bridge over the Monday River, an essential element of the Eastern Metropolitan Corridor (CMDE), has progressed in general terms by 23%. Works are carried out on both sides of the river, where significant progress has been made in the construction of piles, lintel beams and piles, key components of the main structure. On the left bank, in the area of President Franco, progress is made in the co…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium