Published • loading... • Updated
ST3 Cannot Be Delivered on Time, so Sound Transit Is Considering Light Rail Cuts
Summary by KUOW
2 Articles
2 Articles
ST3 cannot be delivered on time, so Sound Transit is considering light rail cuts
Sound Transit will celebrate opening a light rail connection across Lake Washington later this month, but behind the excitement, the agency faces a brutal financial future. Sound Transit can't deliver on its ST3 promises to voters by 2046 as planned.
·Seattle, United States
Read Full ArticleSound Transit Advances Design on Federal Way Maintenance Base
The Sound Transit board is poised to award a $350 million contract to advance the agency's next train maintenance base in Federal Way, a major component of future system expansion plans, to full design and pre-construction. Planned on a 70-acre site to the south of the 1 Line's current terminus in Downtown Federal Way, the new base is set to open by 2031 or 2032.The base will be specifically designed to handle the next generation of light rail v…
Coverage Details
Total News Sources2
Leaning Left1Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium
