Published • loading... • Updated
Scatec Secures 25-Year PPA with Tunisia’s STEG for 120 MW Tataouine Solar Project, Strengthening Country’s Renewable Energy Push
Summary by solarquarter.com
1 Articles
1 Articles
Scatec Secures 25-Year PPA with Tunisia’s STEG for 120 MW Tataouine Solar Project, Strengthening Country’s Renewable Energy Push
Scatec ASA, a renewable energy solutions provider, has been awarded a 25-year Power Purchase Agreement (PPA) by Tunisia’s state-owned utility Société Tunisienne de l’Electricité et du Gaz (STEG) for the […] The post Scatec Secures 25-Year PPA with Tunisia’s STEG for 120 MW Tataouine Solar Project, Strengthening Country’s Renewable Energy Push appeared first on SolarQuarter.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium