Skip to main content
See every side of every news story
Published • loading... • Updated

Rosatom Has a Technical Plan for a Possible Phased Launch of the WEC Units.

Summary by Interfax.ru
A technical plan has been drawn up for the possible phase-in of the Zaporozhsk nuclear power plants (ZAES), and the CEO of Rosatoma, Alexei Lihachev, stated. "We have this plan both in our heads and on paper.

3 Articles

Lean Right

A technical plan has been drawn up for the possible phase-in of the Zaporozhsk nuclear power plants (ZAES), and the CEO of Rosatoma, Alexei Lihachev, stated. "We have this plan both in our heads and on paper.

Rosatom intends to start lifting the power of the Zaporozh nuclear power plant when the situation will guarantee the safety of the facility after the war risks have been removed, which was announced by the CEO of the State Corporation, Alexei Lihachev, to journalists in Yerevan after negotiations with the Armenian leadership.

Rosatom will launch a plan to launch the Zaporozh nuclear power plant when the war risks are removed, reported by the CEO of Rosatoma, Alexei Lihachev.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Interfax.ru broke the news on Tuesday, September 29, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal