The repair work on the Overcingeltunnel in Assen is just over halfway complete. Although it is currently still a huge mess inside the tunnel, contractor BAM has already started preparations for laying new asphalt and installing a sewage system to drain the cause of the leakage: groundwater.
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The repair work on the Overcingeltunnel in Assen is just over halfway complete. Although it is currently still a huge mess inside the tunnel, contractor BAM has already started preparations for laying new asphalt and installing a sewage system to drain the cause of the leakage: groundwater.