Published • loading... • Updated
Phase 2 Drill Program Commences at Green Monster Project in Nevada
Summary by Kingston Whig-Standard
2 Articles
2 Articles
Glenstar Minerals starts Phase 2 drill program at Green Monster Project, Nevada – Resource World Magazine
Glenstar Minerals Inc. [CSE: GSTR; OTCQB: GSTRF; FSE: VO20] reported that the Phase 2 drill program at the company’s Green Monster Project in Nevada has begun. Alloy Drilling of Elko, Nevada mobilized its crew and equipment over the weekend and has commenced drilling. Utilizing a track mounted reverse circulation drill, nine holes will be collared over four targeted locations along 300 metres of strike length. Two holes are targeted in the area w
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
