Skip to main content
See every side of every news story
Published loading...Updated

Pertinent report missing in Bulacan flood control project, says DPWH engineer

Summary by Manila Bulletin
A Department of Public Works and Highways (DPWH) engineer told the Sandiganbayan Third Division that a controversial flood control project in Pandi, Bulacan allegedly lacked the required construction materials test report despite being reported as 95.75 percent complete.During the Wednesday, May 20 hearing in the malversation through falsification case against former senator Ramon “Bong” Revilla Jr., DPWH Bulacan First District Engineering Offic…

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Manila Bulletin broke the news on Wednesday, May 20, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal