Dresden - At the Nossener Brücke in Dresden from Friday, 8 May, until Sunday, 10 May 2026, repair work on the steel structure is carried out. The area of the bridge is affected by the systems of the Deutsche Bahn. Welding seams, which are damaged by cracks, are renewed.In order to keep the restrictions on traffic as low as possible, the welding work takes place at night. The full locks are planned for the nights from 8 to 9 May and from 9 to 10 …
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Dresden - At the Nossener Brücke in Dresden from Friday, 8 May, until Sunday, 10 May 2026, repair work on the steel structure is carried out. The area of the bridge is affected by the systems of the Deutsche Bahn. Welding seams, which are damaged by cracks, are renewed.In order to keep the restrictions on traffic as low as possible, the welding work takes place at night. The full locks are planned for the nights from 8 to 9 May and from 9 to 10 …