Published • loading... • Updated
Mtsamboro: the Pontoon Allowed by Integrating the Fragility of the Lagoon
Summary by Le Journal De Mayotte
1 Articles
1 Articles
A prefectural decree signed on 12 November 2025 authorizes the construction of a pontoon on the island of Mtsamboro. Two million euros, three months of work, piles, aluminum and wood... and a series of prescriptions that sometimes seem more intended to check boxes than to really protect the fragile ecosystem of the lagoon. Lagoon piles: a millimetred construction site The piles of the future pontoon will be beaten on site using barges and specia…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium