Skip to main content
See every side of every news story
Published • loading... • Updated

Gujarat powers up govt buildings with solar energy; 95 MW capacity installed, another 65 MW targeted

  • Gujarat plans to install rooftop solar systems on 15,000 additional government buildings during the current financial year, adding about 65 MW of capacity.
  • The state had equipped 6,014 government buildings with rooftop solar systems by March 2026, reaching 95 MW of total installed capacity.
  • Gujarat allocated Rs 314 crore for the programme in 2026-27, including funding for general, Social Justice and Empowerment, and Tribal Development buildings.
  • The state introduced a monitoring system that records solar performance every 15 minutes and issues remote alerts.
Insights by Ground AI

11 Articles

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 67% of the sources lean Right
67% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

India Shorts broke the news on Monday, October 5, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal