Skip to main content
See every side of every news story
Published loading...Updated

Giant 80-Metre Wind Turbines Begin Making Their Way to NSW Wind Farm

Transport for NSW said the 80-metre blade is one of about 700 deliveries for the 69-turbine project.

Summary by Big Rigs
The first wind turbine movement for the project departed the Port of Newcastle in the early hours of August 10. Image: Live Traffic NSW The first of numerous oversize overmass (OSOM) wind turbine blade movements set off from the Port of Newcastle this morning, bound for the Uungula Wind Farm development, near Wellington, NSW. Each 80-metre blade will be transported along a 320-kilometre route from the Port of Newcastle via Industrial Drive, Paci…

9 Articles

singletonargus.com.ausingletonargus.com.au
+3 Reposted by 3 other sources
Lean Left

Drone captures first wind turbine blade journeying through Jerrys Plains

The first mega-sized turbine blade for Uungula Wind Farm near Wellington left Port of Newcastle. See drone footage and traffic warnings for its central west journey.

dungogchronicle.com.audungogchronicle.com.au
+2 Reposted by 2 other sources
Center

Watch moment first turbine blade leaves port for wind farm

See the mega-sized load heading to Uungula Wind Farm near Wellington. Drone footage captured its journey after leaving Port of Newcastle.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 71% of the sources lean Left
71% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

fullyloaded.com.au broke the news on Monday, August 10, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal