Skip to main content
See every side of every news story
Published loading...Updated

Genera Pr Is Authorized to Proceed with the Federal Project to Gasify Two Units of the San Juan Power Plant

Summary by El Nuevo Día
If FEMA approvals are obtained, the conversions of the two plants in the metropolitan area would be underway this summer.

3 Articles

Center

If FEMA approvals are obtained, the conversions of the two plants in the metropolitan area would be underway this summer.

·Puerto Rico
Read Full Article

SAN JUAN – The Puerto Rico Energy Negotiate (NEPR) issued a Resolution and Order by which it authorized the proposal presented by Genre PR to convert units 7 and 9 of the San Juan Central to natural gas as primary fuel, maintaining Fuel Oil (Bunker C) as a backup fuel. “Considering the above, and guided by the public interest, the Negotiate determines that the balance of interests favors the approval of the proposal and that it complies with the…

Read Full Article

The Energy Negotiate of Puerto Rico (NEPR) authorized the proposal of Genera PR to convert units 7 and 9 of the Central San Juan to natural gas as primary fuel, maintaining fuel oil (Bunker C) as a backup option. The determination allows the company to advance with the necessary procedures to obtain federal funds destined for the project. In the Resolution and Order issued, the regulatory agency concluded that the proposal complies with the curr…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

La Perla del Sur broke the news in on Saturday, March 21, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal