Published • loading... • Updated
Feedback wanted on Hydro One Draft Environment Study
Summary by windsornewstoday.ca
1 Articles
1 Articles
Feedback wanted on Hydro One Draft Environment Study
A draft Environmental Study Report (ESR) for the Hydro One Longwood to Lakeshore Transmission Line project is now available for public viewing and feedback.The project involves developing two new single-circuit 500 kilovolt (kV) transmission lines between the Longwood Transformer Station (TS) in Strathroy-Caradoc and Lakeshore TS along the north side of the Thames River, Chatham, and Tilbury before reaching Lakeshore.The Independent Electricity …
·Kemptville, Canada
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left1Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium