Published • loading... • Updated
New Bridge in Oberhausen: Construction Time only Seven Months Instead of 24 Months - How Is that Possible?
Summary by wdr.de
2 Articles
2 Articles
A spectacular construction phase starts at the A516 in Oberhausen: Huge concrete precasts arrive – we report in the live ticker.
All of Germany is now looking at a new procedure for the construction of a motorway bridge in Oberhausen.
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
