Eskom has confirmed that Blocks C, X and X Ext, Hebron, Itsoseng, Libanon, Mabopane Blocks U and UX, and Morula View will lose power on Friday, 12 June. The power outage is part of planned maintenance on the utility’s distribution network and is not related to load shedding or an emergency fault. The power cut will begin at 7:00 and end at 23:00, a 16-hour power outage that will run through the full day and into the late evening. Why is the powe…