The Tunnel on the A1 Motorway Between Margina and Holdea, Was Completely Pierced by the Press Agency Rador
4 Articles
4 Articles
The builders completed the excavation of the four tunnel tunnels on the Margina–Holdea section, which totals more than 4.5 km. The most difficult stage of the yard was completed through the unstable hills of Holdea, where hundreds of workers worked day and night.
The longest motorway tunnel in the country has been completely pierced. It is about the double gallery structure on the A1 motorway between Margina and Holdea. An important work that will ensure continuity on the Lugoj-Deva segment. CNAIR's Director General, Cristian Pistol, announced that the construction teams have completed the most difficult [...]
The tunnels between Margina and Holdea, on the motorway A1 Lugoj – Deva, were completely pierced, marking the completion of one of the most difficult stages of the works at the trunk that must ensure the continuity of the highway in western Romania. Tunnel 2 Margina – Holdea has two galleries, with lengths of 1,985 meters and 1,825 meters, being the longest motorway tunnel built so far in Romania. The excavation works took about two years and we…
Dinel Miruța was filmed on Wednesday on the Bear Tunnel site on the A1 motorway, after the two galleries of the longest highway road tunnel in Romania were pierced. The interim Minister of Transport presented the moment as proof that "it can also be done in Romania, although the works were started and carried out before [...]
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium







