Published • loading... • Updated
Lansing Bridge Implosion Set for Dec. 19, Safety Protocols in Place
The implosion will remove the main span for a new bridge expected to open in 2027, with extensive safety zones and a livestream for public viewing.
5 Articles
5 Articles
WisDOT outlines safety plans for WIS 82/IA 9 Mississippi Bridge demolition
MADISON, Wis. -- The Wisconsin Department of Transportation in conjunction with the Iowa Department of Transportation outlined safety plans for the upcoming WIS 82/IA 9 Mississippi Bridge demolition.
·Madison, United States
Read Full ArticleDept. of Transportation: Safety plans announced for WIS 82 / IA 9 Mississippi River Bridge demolition on Friday
The Wisconsin Department of Transportation (WisDOT), together with the Iowa Department of Transportation, are providing details of the planned implosion on Friday, Dec. 19 for the WIS 82 / IA 9 Mississippi River Bridge project. The implosion and removal of the...
·Madison, United States
Read Full ArticleCoverage Details
Total News Sources5
Leaning Left0Leaning Right1Center4Last UpdatedBias Distribution80% Center
Bias Distribution
- 80% of the sources are Center
80% Center
C 80%
R 20%
Factuality
To view factuality data please Upgrade to Premium



