Published • loading... • Updated
CERC Rejects TANGEDCO’s Plea For Detailed Power Drawal Data In ISTS Charges Dispute
Summary by solarquarter.com
1 Articles
1 Articles
CERC Rejects TANGEDCO’s Plea For Detailed Power Drawal Data In ISTS Charges Dispute
The Central Electricity Regulatory Commission (CERC) has passed an order on an interlocutory application filed by Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO), seeking directions against the Grid Controller […] The post CERC Rejects TANGEDCO’s Plea For Detailed Power Drawal Data In ISTS Charges Dispute appeared first on SolarQuarter.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium