BAXTER — A bid opening for the 2026 mill and overlay improvement projects in Baxter is expected April 16 with those bids before the Baxter City Council on May 5. Street segments included in the proposal, which would grind off the top of the street pavement and replace it with a fresh layer to extend the road’s life, include:
Joneswood Circle,
Joneswood Drive,
Joshua Tree Circle,
Joshua Tree Drive,
Knotty Pine Drive,
Marble Road (west of Ja…