Skip to main content
See every side of every news story
Published loading...Updated

A7 Reaches Bacău: 47 Km Open Monday at 16. Alin ŞErbănescu, CNAIR: "The Road From Bucharest Will Take 2 Hours and 38 Minutes.

Summary by Digi 24
The 47 kilometers of the Moldovan Highway between Adjud and Bacău Sud will be opened Monday, from 16:00. The drivers will be able to go on the highway from Bucharest to Bacău, and the journey will take, with respect to speed limits, two hours and 38 minutes, said to Digi24 Alin Şerbănescu, the CNAIR spokesman. After the completion of the connection work, the circulation will be extended by another four kilometers, to the road node Bacău Nord.

12 Articles

Center

The 47 kilometers of the Moldovan Highway between Adjud and Bacău Sud will be opened Monday, from 16:00. The drivers will be able to go on the highway from Bucharest to Bacău, and the journey will take, with respect to speed limits, two hours and 38 minutes, said to Digi24 Alin Şerbănescu, the CNAIR spokesman. After the completion of the connection work, the circulation will be extended by another four kilometers, to the road node Bacău Nord.

·Bucharest, Romania
Read Full Article
Lean Left

About 47 km from "Moldova's A7 motorway will be opened to traffic on Mondays, starting at 4 p.m., practically linking Bucharest Basin on the motorway, an uninterrupted distance of almost 300 km from the high-speed road. Bucharest – Bacău, fully on the motorway on Mondays from 4 p.m. will be opened on about 47 km ...

·Romania
Read Full Article

Stirea de Iasi The ideal source of local news and information in Iași Today, traffic opens on another 47 kilometers of the A7 Motorway, on the Adjud – Bacău section Starting Monday afternoon, at 4:00 p.m., a vital piece of the Moldovan Motorway (A7) is opened to traffic: the 47-kilometer section between Adjud and Bacău Sud. The information was officially confirmed by the National Road Infrastructure Management Company (CNAIR). This inauguration …

The National Road Infrastructure Management Company (CNAIR) will open Monday, at 16:00, the 47-kilometre traffic of the Moldova A7 motorway, and the Adjud - Bacău section built by UMB, reconfirmed for ECONOMICA.NET representatives CNAIR.

The 47.10 km drive from the Moldova A7 motorway, between Adjud and Bacău Sud, will be open Monday, August 31st, from 16:00. Once the two lots built by UMB are inaugurated, the drivers will be able to travel on the motorway from Bucharest to the Bacău area, in a first step to the road node that makes [...]

From today, the Moldovan Highway reaches Bacău. At 16:00 the traffic would open more than 47 new kilometers from A7, between Adjud and Bacău. Attention however, on a sector will not be able to circulate, according to europafm.ro. "The North Bacău Node will not open today. We expect it, if not this week, [...] The post Over 47 new kilometers of the Moldovan Highway will open the traffic appeared first on FocusPress.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources lean Left, 50% of the sources are Center
50% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

ziaruldebacau.ro broke the news on Sunday, August 30, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal