Skip to main content
See every side of every news story
Published loading...Updated

U.S. Army To Spend $2.2B On Nuclear Microreactors At Military Bases

The Janus program aims to give bases resilient power as reactors run for years without refueling and the Army expects more than 20 to be built.

  • On Wednesday, the U.S. Army awarded up to $2.2 billion to five companies to deploy nuclear microreactors at five military bases under its Janus Program, securing energy independence for installations.
  • Part of the Janus Program unveiled last year, the military seeks to deploy portable reactors that provide resilient power if commercial grids fail or face cyberattacks affecting critical operations.
  • Five vendors including Radiant Industries and Antares Nuclear will install units at Fort Bragg, Fort Campbell, Fort Hood, Fort Benning, and Fort Drum, with capacity ranging from 1 to 20 megawatts per reactor.
  • Factory-Built facilities can power up within 48 hours of arrival at bases. Jeff Waksman, principal deputy assistant secretary of the Army for installations, energy and environment, emphasized the reactors' rapid deployment capability.
  • While the Army will license the reactors, officials intend for the technology to transition to the commercial market later. The Army is coordinating with the Energy Department to remove radioactive waste with no long-term storage on-site.
Insights by Ground AI

15 Articles

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 75% of the sources are Center
75% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Revista Defensa Infodefensa.com broke the news on Sunday, August 30, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal