Published • loading... • Updated
An Additional 200 Megawatts of Electrical Power Have Been Approved.
Summary by UNO Radio Group
2 Articles
2 Articles
The Energy Bureau approved a contract that will allow the addition of 200 megawatts of generation to the electrical system, a decision that raises to 800 megawatts the capacity recently authorized to address the lack of generation and reduce load shedding.
Open the article to view the coverage from Es Noticia PR
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center1Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium
