AB Vassilopoulos: New Storage and Distribution Center in Elefsina – Turnover of 2 Billion Euros in 2025
7 Articles
7 Articles
AB Vassilopoulos inaugurated a new 35,500 sq m logistics center in Elefsina, strengthening the supply chain with 35 ramps, new technologies and the ability to manage 6,000 codes and 24 million boxes annually.
AB Vassilopoulos inaugurated today, in the presence of the Ambassador of the Kingdom of the Netherlands to Greece, Mrs. Barbara van Hellemond, the new storage and distribution center in Elefsina. With a total… AB Vassilopoulos: New Storage and Distribution Center in Elefsina – Turnover of 2 billion euros in 2025 - NAFTEMPORIKI
AB Vassilopoulos: Investments of 52 million euros in 2025 and planning for a total network of 900 stores by 2028 – The new distribution center in Elefsina, the plan for a unified logistics infrastructure, the private label and children's ready meals AB Vassilopoulos is seeking a return to net profitability from 2027, as the multi-year transformation […] The article AB Vassilopoulos: The goal is to return to profits from 2027 with the "vehicle" o…
AB Vassilopoulos inaugurated on Monday (28.9.2026) its new data center in Elefsina, further strengthening its infrastructure, while the presence of ... The article AB inaugurated a new data center in Elefsina - Lavida satisfied with the turnover of 2 billion euros in 2025, with an increase of 3.5% was published in NewsIT.
The new storage and distribution center in Eleusis was inaugurated today by AB Vasilopoulos, in the presence of the Ambassador of the Kingdom of the Netherlands in Greece, S.A.
The new Elefsina Center will handle products from 17 non-food categories, a total of approximately 6,000 codes, while the facility has a handling capacity of over 24 million boxes per year.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium











