The National High Court has incorporated into the separate piece of the Koldo case which investigates the alleged fraud in public works contracts the report with which Adif justifies the final certification of a work executed on Asturian tracks: the stabilization of several slopes of the trenches of the old Feve line between Gijón and Pravia located in Soto del Barco. The action, awarded emergency to Levantina Engineering and Construction S.L. —…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The National High Court has incorporated into the separate piece of the Koldo case which investigates the alleged fraud in public works contracts the report with which Adif justifies the final certification of a work executed on Asturian tracks: the stabilization of several slopes of the trenches of the old Feve line between Gijón and Pravia located in Soto del Barco. The action, awarded emergency to Levantina Engineering and Construction S.L. —…